View Details
Bid Classification: |
Construction
|
---|---|
Bid Type: | Request for Bids - RFB |
Bid Number: | RFB-2022-0019 |
Bid Name: | 2022-35 Bridge 05.65N-05.50E Replacement |
Bid Status: | Awarded |
Bid Awarded Date: | Wed Feb 15, 2023 (CST) |
Published Date: | Tue Jan 10, 2023 8:00:00 AM (CST) |
Bid Closing Date: | Thu Feb 9, 2023 10:00:00 AM (CST) |
Electronic Auctions: | Not Applicable |
Language for Bid Submissions: | English unless specified in the bid document |
Submission Type: | Online Submissions Only |
Submission Address: | Online Submissions Only |
Public Opening: | No |
Description: |
Douglas CountyProject 2022-35 consists of removing an existing 2-12’x12’x57.5’ RFB and constructing a 36’-48’-36’ Reinforced Concrete Haunched Slab (RCHS) Bridge on spread footing piers. Items include Contractor Staking, Clearing & Grubbing, Fence Removal, Grading, Contractor Furnished Excavation, Entrance Pipe, Steel Piling, Resteel, Concrete, Concrete Pavement (10”), Guardrail, Aggregate Ditch Lining, Rip Rap, Aggregate Base (AB-3), Surfacing Material (AB-3), HMA-Commercial Grade (Class A) for guardrail widening, HMA Base (SR-12.5), HMA Surfacing (SR-12.5), Seeding, and Traffic Control. Project 2022-35 is located on Route 1029 (E550 Road) between N500 and N600 Roads approximately 20 miles southwest of Lawrence, KS. The anticipated “Notice to Proceed” is April 4, 2023. The late “Notice to Proceed” is June 12, 2023. This contract is a calendar completion project as stated in Special Provision 15-DG-108. |
Bid Document Access: | Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. There is no cost to obtain an unsecured version of the document and /or to participate in this solicitation. |
Categories: |
Show Categories [+]
|